Medical Factory Cooling Tower
Installation Details
Model: | Vulcan S100 |
Installation Area: | cooling tower in a medicine factory |
Circulation Water Capacity: | 100 m3/h |
Pipe Diameter: | 150 A |
The cooling tower roof of medicine factory
The purpose:
- Prevents from scale
- Prevents from heat exchanger effectiveness loss
- Cleaning maintenance cost of plate heat exchanger can be reduced
The effect:
After Vulcan was installed for some months, the scale in the cooling tower, plate heat exchanger and the pipe become soft; and it can be removed easily with a finger.
Vulcan S100 installation
Cooling Tower Grid
Before Vulcan was installed: the outside of the cooling tower. After Vulcan was installed for 5 months: the scale can be removed easily with a finger.
Before Vulcan was installed: the inside of the cooling tower. After Vulcan was installed for 5 months: the scale has been reduced.
Plate Heat Exchanger
After Vulcan was installed for 9 months: ready open the plate heat exchanger and clean.
The scale on the plate heat exchanger becomes soft.
After Vulcan was installed for 9 months: the plate heat exchanger was taken apart for cleaning.
The scale can be easily removed.
Circulation Pipe
The scale in the circulation pipe can also be easily removed with a finger.