Our Client References
BioSolutions has clients in various business sectors who sing the praises of the Vulcan Electronic Anti-Scale system. Indonesia’s mountainous and/or maritime terrain results in hard or very hard water causing scale problems. We would be happy to share with you our local and international references, some of which are below.
Holiday Resort Lombok, Indonesia
Their Engineering team had to manually remove scale from pumps, valves, kitchen equipment and from the 102 individual electric hot…
Chrysler Transmission Plant in Kokomo, Indiana
Acid cleaning of nozzles every 3 weeks before, after install of Vulcan no cleaning at all. Saving of $15,000 USD…
Kunshan Xingbao Plastic
Before Vulcan chemical cleaning of heat exchangers and electronics for plastic moulding machines was expensive and damaged the equipment, after…
Super Mall Karawaci, Jakarta
A field test was conducted in Super Mall Karawaci to see the effectiveness of installing Vulcan water treatment on the…
Reverse Osmosis Electroplating Facility, Inner Mongolia
Aluminum wheel manufacturer installed Vulcan to improve performance of RO filter system to provide pure water for the paint workshop.…
Coca Cola Factory, Marrakech, Morocco
A Coca-Cola plant in Morocco was having scale issues blocking pipes and filters. By adding a small Vulcan unit the…
Hyundai Motor Ulsan, Korea
Since Vulcan S25 was installed, the Hyundai Engineering Team has stopped the regular manual cleaning process.
Kiyokawa Plating Industry in Fukui, Japan
Treatment of water in the Grease Trap in a Electroplating facility in Japan. Since Vulcan was installed the odour normally…
Toray Industries, Gyeongbuk, Korea
Producer of Textiles, plastics, chemicals and carbon fibre composite materials had a consistent problem with scale on plate heat exchangers…
Nestlé, Kiryat Malachi, Israel
Ice Cream Factory. Before Vulcan installation scale build up in hot water pipes would fully block the pipes leading to…
Poultry Farms, Morocco
Cooling systems for hens would build up with scale described by facility staff as “hard as stone”. After Vulcan units…
Ibis Budget – Makassar Airport
Vulcan has shown to successfully reduce time, energy and capital required by the hotel for water system maintenance. All pictures …
Cooling Tower Savings
A cost comparison on a Cooling Tower installation of immediate savings as well as additional savings of 5-15% savings in…
TDK Dalian Electronics
TDK Electronics after testing the Vulcan in a cooling system for 18 months purchased an additional 3 units for cooling…
Medical Factory Cooling Tower
The Cooling System of a Medicine production facility has problems with hard scale leading to reduced efficiency and the need…
Energy Complex Co., Ltd. (EnCo) Bangkok, Thailand
Energy Complex is the first office complex in Thailand and Southeast Asia to be awarded the highest level of Platinum…
Vulcan International Reference
Click this link for more information from Vulcan International on:
- Client list
- Studies
- Cooling Towers
- Commercial and Industrial
- Homeowners