Cooling Tower Savings
Installation Details
Model: | Vulcan S100 |
Installation Area: | cooling tower for 100RT turbo chiller, 24-hour yearly operation |
Circulation Water Capacity: | 120 m3/h |
Pipe Diameter: | 150 A |
Effect: | chemical treatment reduced |
Full Chemical-treatment vs. Vulcan-treatment Indicates:
Under 1 year, with Vulcan treatment is already less costly than full chemical treatment
Download PDF
Cost reduction by Vulcan 10-year warranty:
Further benefits
Electric saving: about 5-15%, by the scale prevention on the turbo chiller
Gas saving: about 5-25%, by the scale prevention on the absorption chiller
Equipment life extension: about 30-60%